Raptor 30/50 v1 assembly
manual
Page 8 [click here for index]
This is the washout assembly. It goes on the main shaft, just
under the head block. More then once I have seen this installed
with the hub (9) upside down. The shouldered section goes toward
the bottom.
Start by inserting the bearings (3), or bushings if you have the
29BB kit, into the control levers (7). Slide the sleeve (4) onto
the bolt (2) then insert the bolt through the bearings in the
control arm (7) and into the hub (9). After you have both control
arms installed bolt the ball (6) using the M2x10 screw onto the
inside hole of the control arm. Note: The shouldered part of the
ball will go against the control arm. The outside hole is used to
increase the roll rate, but the problem is the helicopter has a
more twitchy feel to it. The best way to increase the roll rate
is to run a higher rotor speed (Not to exceed 2000 rpm) or to run
different flybar paddles. Next install the washout linkage (8).
Slide it onto the control arm and insert the pin (5).

Go to Page 9