Raptor Technique

Raptor 30/50 v2 assembly manual

Tools needed <here>
Page 1 - building tips
Page 2 - clutch bell assembly
Page 3 - check pinion bearing fit
Page 4 - main frames
Page 5 - fuel tank
Page 6 - start shaft and fuel tank
Page 7 - elevator control arm
Page 8 - pitch arm
Page 9 - elevator and aileron levers
Page 10 - main gear
Page 11 - main shaft, main gear, swashplate
Page 12 - washout assembly
Page 13 - engine/fan/clutch
Page 14 - engine and muffler install
Page 15 - landing skids
Page 16 - flybar and mixing levers
Page 17 - rotor head assembly
Page 18 - install rotor assembly
Page 19 - tail slider and hub with grips
Page 20 - tail gear
Page 21 - belt, tail case, vertical fin
Page 22 - tail guides, horiz fin, support rods
Page 23 - install tail boom assembly
Page 24 - servo installation
Page 25 - final notes